- Procured By: Puerto Rico Department of Housing (PRDOH)
- Assignment: DR
- Contract Number: 2020-DR0031
- DUNS Number: 116588733
- Execution Date: 11/27/2019
- End Date: 11/26/2022
- Total Amount: $50,000,000.00
- CDBG-DR Funds: $50,000,000.00
- Brief Description: YATES-BIRD, LLC has been procured to provide Construction Managers services under the CDBG-DR Home Repair, Reconstruction, or Relocation Program (R3).
DOWNLOAD VIEW PROCUREMENT
AMENDMENTS
- Execution Date: 12/30/2022
- End Date: 11/25/2024
- Total Amount: $50,000,000.00
- CDBG-DR Funds: $50,000,000.00
- Brief Description: This Amendment D entails an increase of the total amount of the Agreement.
DOWNLOAD
- Execution Date: 06/13/2022
- End Date: 11/25/2024
- Total Amount: N/A
- CDBG-DR Funds: N/A
- Brief Description: This Amendment C extend the term of the contract for an additional 24 months.
DOWNLOAD
- Execution Date: 09/17/2021
- End Date: 11/26/2022
- Total Amount: $100,000,000.00
- CDBG-DR Funds: $100,000,000.00
- Brief Description: This Amendment B increase the total amount by ONE HUNDRED MILLION DOLLARS ($100,000,000.00) for an adjusted total amount of ONE HUNDRED EIGHTY MILLION DOLLARS ($180,000,000.00).
DOWNLOAD
- Execution Date: 06/02/2021
- End Date: 11/26/2022
- Total Amount: $30,000,000.00
- CDBG-DR Funds: $30,000,000.00
- Brief Description: This Amendment A increase the total amount by THIRTY MILLION DOLLARS ($30,000,000.00) for an adjusted total amount of EIGHTY MILLION DOLLARS ($80,000,000.00).
DOWNLOAD
SUBCONTRACTOR
- Contractors Caribbean LLC: The Subcontractor shall perform Roofing Work of new Homes (“Reconstruction Homes”) and/or repair of existing Homes (“Repair Homes”). Work shall be performed consistent with federal and state regulations and/or policies. The Subcontractor shall perform the Roofing Work as per the following: Reconstruction Homes - New Roofing Work (Polyurethane, Elastomeric, or Silicone roofing materials) including clean-up, surface preparation, details, and product application. Repair Homes - Roofing Work (Polyurethane, Elastomeric, or Silicone roofing materials) including pressure washing, surface preparation, details, and product application. Work includes all required preparatory work, clean-up and disposal, and protections of work during installation phase. The validity of this Contract begins on April 6, 2020 until July 15, 2022 for a maximum amount of $250,000.00. DUNS number 11-723-2859.
- L&R Contractor, Inc.: L&R Contractor, Inc. shall perform construction of New Homes (“Reconstruction Homes”) and/or repair of existing homes (“Repair Homes”). Subcontractor will coordinate design, permitting, demolition, abatement, repair, and construction of new single-family housing stock. The term of this Contract begins on May 12, 2020 until November 26, 2022 for a maximum amount of $250,000.00. DUNS number 66-0892133.
- RV Engineering Group, Corp.: RV Engineering Group, Corp. shall perform construction of New Homes (“Reconstruction Homes”) and/or repair of existing homes (“Repair Homes”). Subcontractor will coordinate design, permitting, demolition, abatement, repair, and construction of new single-family housing stock. The term of this Contract begins on May 12, 2020 until November 26, 2022 for a maximum amount of $250,000.00. DUNS number 660-798649.
- SRM Builders, LLC: The subcontractor shall perform construction of new homes (“Reconstruction Homes”) and/or repair of existing homes (“Repair Homes”) for the CDBG-DR R3 Program. The term of this contract begins on June 3, 2020 until November 26, 2022 for a maximum amount of $250,000.00. DUNS number 080959577.
- Tiger Group, LLC: The subcontractor shall perform construction of new homes (“Reconstruction Homes”) and/or repair of existing homes (“Repair Homes”) for the CDBG-DR R3 Program. The term of this contract begins on June 4, 2020 until November 26, 2022 for a maximum amount of $250,000.00. DUNS number 660900438.
- Transporte Papito, Inc: The subcontractor shall perform Demolition Work for new homes (“Reconstruction Homes”) for the CDBG-DR R3 Program. The term of this contract begins on June 9 2020 until November 26, 2022 for a maximum amount of $250,000.00. DUNS number 117407111.
- Central Industrial Services: The subcontractor shall perfom Lead and Asbestos Mitigation and Abatement work for new homes (“Reconstruction Homes”) and/or repair of existing homes (“Repair Homes”) for the CDBG-DR R3 Program. The term of this contract begins on June 16, 2020 until November 26, 2022 for a maximum amount of $100,000.00. DUNS number 794774190.
- United Retail Contractors, LLC: The subcontractor shall perform construction of new homes (“Reconstruction Homes”) and/or repair of existing homes (“Repair Homes”) for the CDBG-DR R3 Program. The term of this contract begins on June 16, 2020 until November 26, 2022 for a maximum amount of $250,000.00. DUNS number 117232424.
- The Wright Way Company, Inc.: The subcontractor shall perform construction of new homes (“Reconstruction Homes”) and/or repair of existing homes (“Repair Homes”) for the CDBG-DR R3 Program. The term of this contract begins on June 19, 2020 until November 26, 2022 for a maximum amount of $250,000.00. DUNS number 110191073.
- Telecommserve, LLC: The subcontractor shall perform construction of new homes (“Reconstruction Homes”) and/or repair of existing homes (“Repair Homes”) for the CDBG-DR R3 Program. The term of this contract begins on June 22, 2020 until November 26, 2022 for a maximum amount of $250,000.00. DUNS number 081204243.
- Expert Energy Solutions LLC: The subcontractor shall perform construction of new homes (“Reconstruction Homes”) and/or repair of existing homes (“Repair Homes”) for the CDBG-DR R3 Program. The term of this contract begins on June 25, 2020 until November 26, 2022 for a maximum amount of $250,000.00. DUNS number 117222090.
- Diaz & Diaz Engineers and Contractors Inc.: The subcontractor shall perform construction of new homes (“Reconstruction Homes”) and/or repair of existing homes (“Repair Homes”) for the CDBG-DR R3 Program. The term of this contract begins on July 14, 2020 until November 26, 2022 for a maximum amount of $250,000.00. DUNS number 04-079-6786.
- GM Construction, Inc.: The subcontractor shall perform construction of new homes (“Reconstruction Homes”) and/or repair of existing homes (“Repair Homes”) for the CDBG-DR R3 Program. The term of this contract begins on July 16, 2020 until November 26, 2022 for a maximum amount of $250,000.00. DUNS number 126002950.
- E – Electrical Contractors, LLC: The subcontractor shall perform construction of new homes (“Reconstruction Homes”) and/or repair of existing homes (“Repair Homes”) for the CDBG-DR R3 Program. The term of this contract begins on October 24, 2020 until November 26, 2022 for a maximum amount of $250,000.00. DUNS number 081140457.
- JCD Engineering, Inc.: The subcontractor shall perform construction of new homes (“Reconstruction Homes”) and/or repair of existing homes (“Repair Homes”) for the CDBG-DR R3 Program. The term of this contract begins on December 3, 2020 until November 26, 2022 for a maximum amount of $250,000.00. DUNS number 78-579-6178.
- Value Contractors, LLC: The subcontractor shall perform construction of new homes (“Reconstruction Homes”) and/or repair of existing homes (“Repair Homes”) for the CDBG-DR R3 Program. The term of this contract begins on December 11, 2020 until November 26, 2022 for a maximum amount of $250,000.00. DUNS number 08-127-2273.
- BG Properties Group, LLC: The subcontractor shall perform construction of new homes (“Reconstruction Homes”) and/or repair of existing homes (“Repair Homes”) for the CDBG-DR R3 Program. The term of this contract begins on December 23, 2020 until November 26, 2022 for a maximum amount of $250,000.00. DUNS number 117226769.
- ARCON, LLC: The subcontractor shall perform construction of new homes (“Reconstruction Homes”) and/or repair of existing homes (“Repair Homes”) for the CDBG-DR R3 Program. The term of this contract begins on January 21, 2021 until November 26, 2022 for a maximum amount of $250,000.00. DUNS number 080905436.
- AJR Contractor, LLC: The subcontractor shall perform construction of new homes (“Reconstruction Homes”) and/or repair of existing homes (“Repair Homes”) for the CDBG-DR R3 Program. The term of this contract begins on January 13, 2021 until November 26, 2022 for a maximum amount of $250,000.00. DUNS number 117225745.
- OSSAM Construction Inc.: The subcontractor shall perform construction of new homes (“Reconstruction Homes”) and/or repair of existing homes (“Repair Homes”) for the CDBG-DR R3 Program. The term of this contract begins on January 13, 2021 until November 26, 2022 for a maximum amount of $250,000.00. DUNS number 859253734.
- L & A Contractors Inc.: The subcontractor shall perform construction of new homes (“Reconstruction Homes”) and/or repair of existing homes (“Repair Homes”) for the CDBG-DR R3 Program. The term of this contract begins on March 15, 2021 until November 26, 2022 for a maximum amount of $250,000.00. DUNS number 117237810.
- Caussade Group, LLC: The subcontractor shall perform construction of new homes (“Reconstruction Homes”) and/or repair of existing homes (“Repair Homes”) for the CDBG-DR R3 Program. The term of this contract begins on May 3, 2021 until November 26, 2022 for a maximum amount of $250,000.00. DUNS number 117304358.
- INNOVAPR, LLC: The subcontractor shall perform construction of new homes (“Reconstruction Homes”) and/or repair of existing homes (“Repair Homes”) for the CDBG-DR R3 Program. The term of this contract begins on April 15, 2021 until November 26, 2022 for a maximum amount of $250,000.00. DUNS number 117386999.
- Bricko, LLC: The subcontractor shall perform construction of new homes (“Reconstruction Homes”) and/or repair of existing homes (“Repair Homes”) for the CDBG-DR R3 Program. The term of this contract begins on April 15, 2021 until November 26, 2022 for a maximum amount of $250,000.00. DUNS number 11-762-4938.
- Camec Group Corp.: The subcontractor shall perform construction of new homes (“Reconstruction Homes”) and/or repair of existing homes (“Repair Homes”) for the CDBG-DR R3 Program. The term of this contract begins on June 9, 2021 until November 26, 2022 for a maximum amount of $250,000.00. DUNS number 117413548.
- E&M Brothers Construction, LLC: The subcontractor shall perform construction of new homes (“Reconstruction Homes”) and/or repair of existing homes (“Repair Homes”) for the CDBG-DR R3 Program. The term of this contract begins on June 23, 2021 until November 26, 2022 for a maximum amount of $250,000.00. DUNS number 116856800.
- V.A.V. Solutions Group Corp.: The subcontractor shall perform construction of new homes (“Reconstruction Homes”) and/or repair of existing homes (“Repair Homes”) for the CDBG-DR R3 Program. The term of this contract begins on June 22, 2021 until November 26, 2022 for a maximum amount of $250,000.00. DUNS number 117247368.
- G- Contractors Group Inc: The subcontractor shall perform construction of new homes (“Reconstruction Homes”) and/or repair of existing homes (“Repair Homes”) for the CDBG-DR R3 Program. The term of the contract begins on August 23, 2021 until November 26, 2022 for a maximum amount of $250,000.00. DUNS number 791535771.
- Professional Group Construction, Inc.: The subcontractor shall perform general construction of new homes under the R3 program of CDBG-DR. The term of the contract begins on September 28, 2021 until November 26, 2022 for a maximum amount of $250,000.00. DUNS number 961714255.
- PRO SITE Builders, LLC : The subcontractor shall perform construction of new homes (“Reconstruction Homes”) and/or repair of existing homes (“Repair Homes”) for the CDBG-DR R3 Program. The term of the contract begins on October 6, 2021 until November 26, 2022 for a maximum amount of $250,000.00. DUNS number 080435656
- Raymond Rivera Guindin CSP : The subcontractor shall perform construction of new homes (“Reconstruction Homes”) and/or repair of existing homes (“Repair Homes”) for the CDBG-DR R3 Program. The term of the contract begins on October 6, 2021 until November 26, 2022 for a maximum amount of $250,000.00. DUNS number 117427382
- SE Contractors, LLC: The subcontractor shall perform construction of new homes (“Reconstruction Homes”) and/or repair of existing homes (“Repair Homes”) for the CDBG-DR R3 Program. The term of the contract begins on October 5, 2021 until November 26, 2022 for a maximum amount of $250,000.00. DUNS number 117324118
- Villamil Cleaning Group Inc: The subcontractor shall perform construction of new homes (“Reconstruction Homes”) and/or repair of existing homes (“Repair Homes”) for the CDBG-DR R3 Program. The term of the contract begins on October 5, 2021 until November 26, 2022 for a maximum amount of $250,000.00. DUNS number 080587083
- ESTIMA SERVICES, LLC: The subcontractor shall perform construction of new homes (“Reconstruction Homes”) and/or repair of existing homes (“Repair Homes”) for the CDBG-DR R3 Program. The term of the contract begins on June 23, 2021 until November 26, 2022 for a maximum amount of $250,000.00. DUNS number 117247696.
- Puerto Rico General Contractors, Inc.: The subcontractor shall perform construction of new homes (“Reconstruction Homes”) and/or repair of existing homes (“Repair Homes”) for the CDBG-DR R3 Program. The term of the contract begins on July 9, 2021 until November 26, 2022 for a maximum amount of $250,000.00. DUNS number 117361620.
- G&C Contractors Inc.: The subcontractor shall perform construction of new homes (“Reconstruction Homes”) and/or repair of existing homes (“Repair Homes”) for the CDBG-DR R3 Program. The term of the contract begins on August 4, 2021 until November 26, 2022 for a maximum amount of $250,000.00. DUNS number 117584661.
- Caribe Hydroblasting Corp.: The subcontractor shall perform lead and Asbestos Mitigation and Abatement of new Homes (“Reconstruction Homes”) and/or repair of existing Homes (“Repair Homes”) for the CDBG-DR R3 Program. The term of the contract begins on November 3, 2021 until November 26, 2022 for a maximum amount of $250,000.00. DUNS number 091022525.
- Infrabuilders, LLC: The subcontractor shall perform construction of new Homes (“Reconstruction Homes”) and/or repair of existing Homes (“Repair Homes”) for the CDBG-DR R3 Program. The term of the contract begins on November 1, 2021 until November 26, 2022 for a maximum amount of $250,000.00. DUNS number 830614496.
- Airtech Solutions: The subcontractor shall perform construction of new homes (“Reconstruction Homes”) and/or repair of existing homes (“Repair Homes”) for the CDBG-DR R3 Program. The term of the contract begins on December 15, 2021 and ends on November 26, 2022. The amount of the contract will not exceed $250,000.00. DUNS number 116915718.
- House Construction, LLC: The subcontractor shall perform construction of new homes (“Reconstruction Homes”) and/or repair of existing homes (“Repair Homes”) for the CDBG-DR R3 Program. The term of the contract begins on January 10, 2022 and ends on November 26, 2022. The amount of the contract will not exceed $250,000.00. DUNS number 117633213.
- Jusino Construction Service, LLC: The subcontractor shall perform construction of new homes (“Reconstruction Homes”) and/or repair of existing homes (“Repair Homes”) for the CDBG-DR R3 Program. The term of the contract begins on January 25, 2022 and ends on November 26, 2022. The amount of the contract will not exceed $250,000.00. DUNS number 117243333.
- A&R DINAMIC GENERAL CONTRACTOR CORP: The subcontractor shall perform construction of new homes (“Reconstruction Homes”) and/or repair of existing homes (“Repair Homes”) for the CDBG-DR R3 Program. The term of the contract begins on February 10, 2022 and ends on November 26, 2022. The amount of the contract will not exceed $250,000.00. DUNS number 791215069.
- PIPES General Contractor: The subcontractor shall perform construction of new homes (“Reconstruction Homes”) and/or repair of existing homes (“Repair Homes”) for the CDBG-DR R3 Program. The term of the contract begins on February 15, 2022 and ends on November 26, 2022. The amount of the contract will not exceed $250,000.00. DUNS number 830849696.
- PMCI GENERAL CONTRACTOR LLC : The subcontractor shall perform construction of new homes (“Reconstruction Homes”) and/or repair of existing homes (“Repair Homes”) for the CDBG-DR R3 Program. The term of the contract begins on February 15, 2022 and ends on November 26, 2022. The amount of the contract will not exceed $250,000.00. DUNS number 118069829.
- Almadec, LLC: The subcontractor shall perform construction of new homes (“Reconstruction Homes”) and/or repair of existing homes (“Repair Homes”) for the CDBG-DR R3 Program. The term of the contract begins on February 17, 2022 and ends on November 26, 2022. The amount of the contract will not exceed $250,000.00. DUNS number 117339823.
- BJ Painting & Clean Services: The subcontractor shall perform construction of new homes (“Reconstruction Homes”) and/or repair of existing homes (“Repair Homes”) for the CDBG-DR R3 Program. The term of the contract begins on March 15, 2022 and ends on November 26, 2022. The amount of the contract will not exceed $250,000.00. DUNS number 965387793.
- [acf_SubContratista_Subcontratista47]: The subcontractor shall perform constructions of new homes (“Reconstruction Homes”) and/or repair of existing homes (“Repair Homes”) for the CDBG-DR R3 Program. The term of this contract begins on March 31, 2022, until November 26, 2022, for a maximum amount of $250,000.00. SAM Unique Entity ID: DXK2JG9FX8L8.
- CS AND M GROUP LLC: The subcontractor shall perform the construction of new homes (“Reconstruction Homes”) and/or repair of existing homes (“Repair Homes”) for the Home Repair, Reconstruction, Relocation (R3) Program of CDBG-DR. The term of this contract begins on April 26, 2022, until November 26, 2022, for a maximum amount of $250,000.00. SAM Unique Entity Identifier MAJJBBEXJJA3.
- Capsol U.S. LLC : The subcontractor shall perform the construction of new homes (“Reconstruction Homes”) and/or repair of existing homes (“Repair Homes”) for the CDBG-DR R3 Program. The term of this contract begins on May 06, 2022, until November 26, 2022, for a maximum amount of $250,000.00. SAM Unique Entity Identifier: XMQHGYMMXZW7.
- Antonio & M Construction, Inc.: The subcontractor shall perform the construction of new homes (“Reconstruction Homes”) and/or repair of existing homes (“Repair Homes”) for the CDBG-DR R3 Program. The term of this contract begins on April 01, 2022, until November 26, 2022, for a maximum amount of $250,000.00. SAM Unique Entity Identifier: CK52GRMF1CX6.
- Q. Construction & Maintenance, Inc. : The subcontractor shall perform the construction of new homes (“Reconstruction Homes”) and/or repair of existing homes (“Repair Homes”) for the CDBG-DR Repair, Reconstruction, and Relocation (R3) Program. The term of this contract begins on May 11, 2022, until November 26, 2022, for a maximum amount of $250,000.00. SAM Unique Entity Identifier: EM7FK9AY44L6.
- GIOFRAN INVESTMENT LLC: The subcontractor shall perform the construction of new homes (“Reconstruction Homes”) and/or repair of existing homes (“Repair Homes”) for the CDBG-DR Repair, Reconstruction, and Relocation (R3) Program. The term of this contract begins on April 03, 2022, until November 26, 2022, for a maximum amount of $250,000.00. SAM Unique Entity Identifier: C3LXNWMS4RD5.
- BERRSOL CONTRACTORS LLC.: The subcontractor shall perform the construction of new homes (“Reconstruction Homes”) and/or repair of existing homes (“Repair Homes”) for the CDBG-DR Repair, Reconstruction, and Relocation (R3) Program. The contract term begins on May 24, 2022, until November 26, 2022, for a maximum amount of $250,000.00. SAM Unique Entity Identifier: H821R6KULJZ8.
- Pacman Contractors & Handyman Inc.: The subcontractor shall perform the construction of new homes (“Reconstruction Homes”) and/or repair of existing homes (“Repair Homes”) for the CDBG-DR Repair, Reconstruction or Relocation (R3) Program. The term of this contract begins on June 20, 2022, until November 26, 2022, the subcontract amount is $150,000.00 dollars. SAM Unique Entity Identifier: F3Q6M3M8VLE9.
- ARK SOLUTION GROUP LLC: The subcontractor shall perform construction of new homes (“Reconstruction Homes”) and/or repair of existing homes (“Repair Homes”) for the CDBG-DR Repair, Reconstruction or Relocation (R3) Program. The term of the contract begins on June 01, 2022 and ends on November 26, 2022. The amount of the contract will not exceed $50,000.00. SAM Unique Entity Identifier: R1HLFN6952T3.
- Fenix Construction Services Corp: The subcontractor shall perform the construction of new homes (“Reconstruction Homes”) and/or repair of existing homes (“Repair Homes”) under the Repair, Reconstruction and Relocation Program of CDBG-DR. The term of this contract begins on May 03, 2022, until November 26, 2022, the subcontract amount is for $50,000 dollars, for a maximum amount of $250,000.00 dollars. SAM Unique Entity Identifier: L534VNB9NKD5.
- HF General Contractor Inc.: The subcontractor shall perform the construction of new homes (“Reconstruction Homes”) and/or repair of existing homes (“Repair Homes”) under the Repair, Reconstruction, Relocation (R3) Program of CDBG-DR funds. The contract term begins on May 17, 2022, until November 26, 2022, the subcontract amount will not exceed $250,000.00 dollars. SAM Unique Entity Identifier: Y3G2NTEQJ2S9.
- Teal Rock Management, LLC.: The subcontractor shall perform the construction of new homes (“Reconstruction homes”) and/or repair of existing homes (“Repair Homes”) under the Repair, Reconstruction, Relocation (R3) Program of CDBG-DR funds. The contract term begins on June 24, 2022, until November 26, 2022. The subcontract amount will not exceed of $100,000.00. SAM Unique Entity Identifier: DCBEDAN4QPX5.
- Egon Consulting Group, Inc.: The subcontractor shall perform the construction of new homes (“Reconstruction homes”) and/or repair of existing homes (“Repair Homes”) under the Repair, Reconstruction, Relocation (R3) Program of CDBG-DR funds. The contract term begins on August 19, 2022, until November 26, 2022. The subcontract amount will not exceed of $250,000.00. SAM Unique Entity Identifier: QJ18MR6FJEP6.
- AZ Group, LLC.: The subcontractor shall perform the construction of new homes (“Reconstruction homes”) and/or repair of existing homes (“Repair Homes”) under the Repair, Reconstruction, Relocation (R3) Program of CDBG-DR funds. The contract term begins on August 15, 2022, until November 26, 2022. The subcontract amount will not exceed of $100,000.00. SAM Unique Entity Identifier: X31DHF8HKFB9.
- CF Breeze Recovery, LLC: The subcontractor shall perform the construction of new homes (“Reconstruction Homes”) and/or repair of existing homes (“Repair Homes”) for the CDBG-DR R3 Program. The term of this contract begins on August 28, 2022, until November 26, 2022, for a maximum amount of $250,000.00. SAM Unique Entity ID-EMF2Y9VG5AA8.
- Imperial Constructions, Inc.: The subcontractor shall perform the construction of new homes (“Reconstruction Homes”) and/or repair of existing homes (“Repair Homes”) for the CDBG-DR Repair, Reconstruction and Relocation (R3) Program. The term of this contract begins on September 5, 2022, until November 26, 2022, for a maximum amount of $250,000.00. SAM Unique Entity Identifier: KSN4HDLNZHD4.
- Forth Construction PR, LLC: The subcontractor shall perform the construction of new homes (“Reconstruction Homes”) and/or repair of existing homes (“Repair Homes”) for the CDBG-DR Repair, Reconstruction and Relocation (R3) Program. The term of this contract begins on October 3, 2022, until November 26, 2022, for a maximum amount of $250,000.00. SAM Unique Entity Identifier: LHFBCL9LXT75.
- Luhring Management Corp: The subcontractor shall perform the construction of new homes (“Reconstruction Homes”) and/or repair of existing homes (“Repair Homes”) for the CDBG-DR Repair, Reconstruction and Relocation (R3) Program. The term of the contract begins on October 12, 2022, until November 26, 2022. The amount of the contract will not exceed $250,000.00. SAM Unique Entity ID- SVBZGMPAG1N7.
- Del Norte Construction, Corp.: The subcontractor shall perform the construction of new homes (“Reconstruction Homes”) and/or repair of existing homes (“Repair Homes”) for the CDBG-DR Repair, Reconstruction and Relocation (R3) Program. The term of this contract begins on December 23, 2022, until November 25, 2024, for a maximum amount of $250,000.00. SAM Unique Entity Identifier: MYW7LBHKNAR3.
- Bilden Construction MGMT & Consulting, LLC.: The subcontractor shall perform the construction of new homes (“Reconstruction Homes”) and/or repair of existing homes (“Repair Homes”) for the CDBG-DR Repair, Reconstruction and Relocation (R3) Program. The term of this contract begins on December 6, 2022, until November 25, 2024, for a maximum amount of $250,000.00. SAM Unique Entity Identifier: CZ8VKBSK5C29.