Budget

Allocation Amount or percentage of Total Allocation Description
$1,507,179,000 Total allocation to address disasters Hurricane Irma (DR-4336) and Hurricane María (DR-4339). 80% Minimum Addressing unmet disaster needs
80% Minimum Addressing unmet disaster needs within the HUD-identified most impacted and distressed areas.
5% Maximum (plus program income) Administrative costs and technical assistance expenditures.
15% Maximum Planning costs are those defined in 42 U.S.C. 5305(a)(12).